04.02 17:00 (UTC+3) lasts. 1 hour and 30 minutes
Modern problems of geophysics and ore geology
The method of georadiolocation inspection of the soil of the roadbed and its base during road construction work
Eremin R.A., Pudova N.G. (FAA “ROSDORNII”)
04.02 17:00 (UTC+3) lasts. 1 hour and 30 minutes
Modern problems of geophysics and ore geology
The method of georadiolocation inspection of the soil of the roadbed and its base during road construction work
Eremin R.A., Pudova N.G. (FAA “ROSDORNII”)
On September 10, 2025, at 10:00 a.m., the annual international...
The Eastern Economic Forum (WEF-2025), dedicated to the theme “The...
On November 21, 2025, the annual conference “Investment Projects, Modernization,...